PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Laying out gravel at the Main Loby (102) Facing South (800x600).jpg Metal decking at Roof Facing West (800x600).jpg Started installing couplers at (2nd Floor) along column 7 between J-M Facing North (800x600).jpg Welded embed at the pour stop Facing West (800x600).jpg Welding the embeds at the pour stops along column line L between 5-3.3 Facing East (800x600).jpg
Previous page Welding the embeds at the pour stops along column line L between 5-3.3 Facing East (800x600)
Welding the embeds at the pour stops along column line L between 5-3.3 Facing East (800x600)